Our impact
What we have delivered, and what changed afterwards
Outputs and outcomes are kept apart on this page, and every figure says where it comes from.
Delivered
These are outputs — things that exist. Each is counted directly from the project records, so the number here and the project pages cannot drift apart.
3
Girls’ hostels completed
Mwarusembe 2023, Kiparang’anda 2024, Dondo Kisiju 2025
240
Hostel places
3 hostels × 80 places
3
Proposed
Awaiting partnership or funding
Since 2005
Organisation-wide figures maintained in the Foundation's records since 2005.
1.5+ Mil
People Served
Lives reached through ARF community development work across Tanzania.
136+
Solar-Powered Wells Built
Deep solar-powered wells bringing clean water closer to home.
15+
Schools Built & Renovated
Classrooms and school facilities built or restored.
20+
Organic Farm Green Houses
Greenhouses supporting organic horticulture and farmer income.
Several of these figures are currently being reconciled against the Foundation's own project reports, which give different totals for some of them and sometimes count different things. They are shown here as published rather than quietly restated, and they will be updated with a stated counting method rather than replaced with another unexplained number.
By programme
Clean water & WASH
Solar-powered wells for schools, dispensaries, villages and farms — the programme most of the others depend on.
Education & girls’ empowerment
Safe accommodation, school construction and learning materials, with the girls’ hostel programme as its flagship.
Sustainable agriculture & livelihoods
Inputs, training, irrigation and a route to market for smallholder farming groups in the Pwani region.
Climate action
A youth-led programme across the blue economy, marine ecosystems, tree planting and climate education.
Project timeline
- 2021Kinene Primary SchoolKinene, MkurangaCompleted
- 2023Mwarusembe Girls’ HostelMwarusembe, MkurangaCompleted
- 2024Kiparang’anda Girls’ HostelKiparang’anda, MkurangaCompleted
- 2024Deep water wells at Mkuranga Primary and Kiparang’anda Secondary SchoolsMkurangaCompleted
- 2025Dondo Kisiju Girls’ HostelDondo Kisiju, MkurangaCompleted
Outcome evidence
These are outcomes — what changed after something was built. Full Form Four division distributions are published on each project page, for 4 schools across 8 examination years.
No improvement percentage is published anywhere on this site. ARF's reports quote several different figures for the same comparison, the candidate cohorts changed size between years, and a change that follows a hostel opening is not by itself proof the hostel caused it. The distributions are shown instead — including the school where results moved in both directions.
- Kiparang’anda Secondary SchoolForm Four results · 2024 · 2025See the distribution
- Kisiju Secondary SchoolForm Four results · 2025 · 2026See the distribution
- Mapinga Secondary SchoolForm Four results · 2023 · 2024See the distribution
- Mwarusembe Secondary SchoolForm Four results · 2022 · 2023See the distribution
Source: National Examinations Council of Tanzania (necta.go.tz), as reproduced in ARF project reports.
Where the work happens
Only projects with verified coordinates appear on the map. Where a location is known by district rather than by point, it is described in words instead of given an approximated pin.
The people behind the figures
How we measure
Outputs are counted from project records. Outcomes come from the schools and from published national examination results. Nothing on this page is a projection.
Where a figure is a stated intention rather than something delivered, the page it appears on says so. Where two ARF reports disagree, neither figure is adopted until the Foundation confirms which is correct.
Data notes
- Outputs and outcomes are separate
- A hostel built is an output. A change in examination results is an outcome. They are never summed.
- No derived percentages
- Examination distributions are published in full instead.
- Historical figures are dated
- Material from The Village Heart (2016) carries its year wherever it appears.
- Some figures are under review
- Where ARF’s reports disagree, the site publishes neither new figure until the Foundation confirms the method.
